Arlington Works public inquiry core documents
Core documents relating to the Arlington Works public inquiry.
- Government policy documents
- Development plan documents
- Supplementary planning documents
- Emerging development plan
- Background documents
- Documents provided by WSP
- Other documents
- Statements
- Documents produced in the Inquiry
- Documents produced after the close of the inquiry
Government policy documents
- CDA1 Revised NPPF (February 2019)
- CDA2 Planning Practice Guidance (2019) (zip file)
- CDA3 National Design Guide (2019)
Development plan documents
- CDB1 Adopted LBRuT Local Plan (July 2018)
- CDB2 Extracts from The London Plan (Consolidated March 2016)
- CDB3 West London Waste Plan
Supplementary planning documents
- CDC1 Refuse and Recycling Storage Requirements SPD (2015)
- CDC2 Design Quality SPD (2006)
- CDC3 East Twickenham Village Plan SPD
- CDC4 Mayor’s Supplementary Planning Guidance on Shaping Neighbourhoods: Play and Informal Recreation (2012)
- CDC5 Planning Obligations SPD (2020)
- CDC6 Technical housing standards – nationally described space standards (2015)
- CDC7 Affordable Housing SPD
- CDC8 Building of Townscape Merit (2015)
- CDC9 Car Club Strategy (2006)
- CDC11 Mayor’s Supplementary Planning Guidance – Affordable Housing & Viability (‘Homes for Londoners’ – August 2017)
- CDC13 Transport SPD (2020)
- CDC14 Air Quality SPD (2020)
Emerging development plan
Background documents
- CDE1 Manual for Streets (Department for Transport, 2007)
- CDE2 Secretary of State for Housing, Communities and Local Government’s letter (including Annex 1) to Mayor of London (March 2020)
- CDE3 Mayor’s response to the Secretary of State's Direction (April 2020)
- CDE4 Council’s Monitoring Report on Housing 2014/15
- CDE5 Council’s Monitoring Report - Housing - 2019/20 and accompanying tables
- CDE6 ‘A City for all Londoners’ (2016)
- CDE7 Report to the Councils of the London Boroughs of Brent, Ealing, Harrow, Hillingdon, Hounslow and Richmond upon Thames by Andrew S Freeman, an Inspector appointed by the Secretary of State for Communities and Local Government 16 March 2015
- CDE8 Assessment of Existing Capacity & Apportionment BPP Consulting 27th February 2014
- CDE9 WLWP Hazardous Waste Assessment 27 February 2014 BPP Consulting
- CDE10 A Strategy for Hazardous Waste Management in England Defra March 2010
- CDE11 Report to the London Borough of Richmond upon Thames by Andrew Seaman, an Inspector appointed by the Secretary of State for Housing, Communities and Local Government 26 April 2018
- CDE12 Waste Sites Monitoring 01/04/2016 – 31/03/2017 London Borough of Richmond upon Thames October 2017
- CDE13 Direction of Travel document, Spring 2020
- CDE14 Homes for Londoners - Affordable Housing Programme 2021-26 Funding Guidance- Mayor of London November 2020
- CDE15 Site Selection and Assessment Process, Summary Report, Final Report – updated, Version No. 1.2, BPP Consulting, 25 July 2014. A document forming part of the West London Waste Plan Evidence base
- CDE16 Evidence Base: Data Compendium, Report for Issue, Version 1.1, BPP Consulting, 29 July 2014. A document forming part of the West London Waste Plan Evidence base
- CDE17 Potential Sites Assessment, Technical Report, Mouchel, 11 January 2011 - A document forming part of the West London Waste Plan Evidence base (zip file)
- CDE18 Planning for Waste Management Facilities: A Research Study, Office of the Deputy Prime Minister, Reference Number 04PD02508, August 2004.
- CDE19 National Planning Policy for Waste, Department for Communities and Local Government, October 2014
- CDE20 Report of the Examination in Public of the London Plan 2019, Report to the Mayor of London, The Planning Inspectorate, File Ref: PINS/SDS0026, 8 October 2019
- CDE21 London Environment Strategy, Mayor of London, Greater London Authority, May 2018
- CDE22 London Waste Map, Mayor of London, an online resource
- CDE23 London’s Hazardous Waste, A Report For The Mayor Of London, Greater London Authority, January 2014
- CDE24 Waste Technical Paper, Local Plan Supporting Study, OPDC - Old Oak and Park Royal Development Corporation, Mayor of London, June 2018
- CDE25 LBRuT’s Local Implementation Plan (LIP3)
- CDE26 LBRuT’s Climate Emergency Strategy (2020)
- CDE27 Richmond upon Thames Whole Plan Viability Assessment (Adams Integra – December 2016)
- CDE28 Richmond upon Thames Intermediate Housing Policy Statement (8 January 2018)
- CDE29 Inspector’s Report to the London Plan (November 2014)
- CDE30 Richmond Strategic Housing Market Assessment 2016
- CDE31 Local Development Scheme 2019-2020
- CDE32 London Borough of Richmond, Employment Sites & Premises Study (Stage 1) 2016 Update (December 2016)
- CDE33 London Borough of Richmond upon Thames, Employment Sites & Premises Study (Stage 2) 2017 update
- CDE34 The Richmond Tenancy Strategy (2019)
- CDE35 The Richmond Housing and Homelessness Strategy 2018-23
- CDE36 The Intermediate Housing Policy Statement (IHPS) (2018)
- CDE37 Letter from the Mayor to the Secretary of State dated 9 December 2020
- CDE38 Letter from the Secretary of State to the Mayor dated 10 December 2020
- CDE39 Letter from the Mayor to the Secretary of State dated 21 December 2020
- CDE40 Lambeth Parking Survey Methodology (2012)
Documents provided by WSP
Original planning application submission, August 2018
- CDF1 4786_2_01_A - Site Location Plan
- CDF2 4786_2_02_A - Site Plan - Ground Floor Existing
- CDF3 4786_3_10_A - Site Plan - Ground Floor Proposed
- CDF4 4786_3_11_A - Floor Plans
- CDF5 4786_3_12_A - Proposed 3D Overview
- CDF6 4786_3_13_A - Perspective Views - Proposed
- CDF7 4786_3_14_A - Perspective Views - Proposed
- CDF8 4786_3_15_A - Roof Plan
- CDF9 4786_3_20_A - Elevations - Main Block
- CDF10 4786_3_21_A - Elevations - Small Block
- CDF11 4786_3_22_A - Elevations - B1 Commercial Units 1
- CDF12 4786_3_23_A - Elevations - B1 Commercial Units 2
- CDF13 4786_3_24_A - Site Section - North East - South West
- CDF14 4786_3_25_A - Bike Store and Refuse Strategy
- CDF15 2(Outline Elevations)
- CDF16 2(Outline Elevations 2)
- CDF17 Air Quality Assessment
- CDF18 Arboricultural Impact Assessment, prepared by Arbtech Consulting Limited
- CDF19 Arboricultural Method Statement, prepared by Arbtech Consulting Limited
- CDF20 Archaeology Desk-Based Assessment, prepared by AB Heritage Archaeological Consultancy
- CDF21 Bat Survey - Emergence and Activity Surveys, prepared by Arbtech Consulting Limited
- CDF22 Design and Access Statement, prepared by Brookes Architects - (zip file)
- CDF23 Financial Viability Assessment, prepared by Grimshaw Consulting
- CDF24 Flood Risk Assessment, prepared by Dr Paul Garrad
- CDF25 Health Impact Assessment, prepared by WSP|Indigo
- CDF26 Internal Daylight and Sunlight Assessment, prepared by EB7
- CDF27 Marketing Report, prepared by Featherstone Leigh Commercial
- CDF28 Noise and Vibration Assessment, prepared by Aulos Acoustics
- CDF29 Outline Construction Logistics Plan, prepared by Caneparo and Associates
- CDF30 Preliminary Ecological Appraisal and Preliminary Bat Roost Assessment Survey, prepared by Arbtech Consulting Limited
- CDF31 Planning Statement, prepared by WSP|Indigo - part 1 and part 2
- CDF32 SAPS with PV Calculations
- CDF33 Site Investigation Report, prepared by Leap Environmental Ltd (zip file)
- CDF34 Sustainability and Energy Statement, prepared by Bluesky Unlimited
- CDF35 Sustainability and Energy Statement with amendments, prepared by Bluesky Unlimited
- CDF36 Topographical Survey, prepared by Sunshine Survey Ltd
- CDF37 Transport Statement, prepared by Caneparo and Associates
- CDF38 Tree Constraints Plan, prepared by Arbtech Consulting Limited
- CDF39 Tree Protection Plan, prepared by Arbtech Consulting Limited
- CDF40 Tree Survey, prepared by Arbtech Consulting Limited
- CDF41 Tree Survey Report, prepared by Arbtech Consulting Limited
- CDF42 Utilities and Foul Water Drainage Assessment, prepared by Glanville
- CDF43 Waste Planning Policy Considerations Report, prepared by Waterman Infrastructure and Environment Limited
- CDF44 Application form
Amendments to application, October 2018
- CDG1 4786_3_10_B - Site Plan - Ground Floor Proposed
- CDG2 4786_3_11_B - Floor Plans
- CDG3 4786_3_20_B - Elevations - Main Block
Other documents
- CDH1 Historic Map 1912-15
- CDH2 Climate Integrated Solutions ‘Energy and Sustainability Strategy Review’ dated 08/01/19
- CDH3 Bespoke ‘Review of Viability Report’ dated November 18
- CDH4 Bespoke ‘Review of Viability Report’ dated February 19
- CDH5 Bespoke letter ref: SD/AL/al dated September 19
- CDH6 London Borough of Richmond Committee Report
- CDH7 Decision notice issued by London Borough of Richmond
- CDH8 Response to LB Richmond Post-Submission Review with Appendices (Grimshaw Consulting Limited – December 2018)
- CDH9 Response No 2 to LB Richmond Post-Submission Review with Appendices (Grimshaw Consulting Limited – March 2019)
- CDH10 Response No 3 to LB Richmond Post-Submission Review with Appendices (Grimshaw Consulting Limited – June 2019)
- CDH11 BTM Register
- CDH12 Planning Permission 94/2139/S191
- CDH13 Appeal Decision dated 10 December 2020 - 4 Manor Road Ltd and Lulworth Homes Ltd vs the London Borough of Richmond upon Thames
- CDH14 Local Transport Note 1/11: Shared Space (Department for Transport, 2011)
- CDH15 Mode of Travel to Work to Mid-Level Super Output Area 007 Census 2011 (Office of National Statistics, 2020)
- CDH16 Employment Density Guide (3rd Edition) (Homes and Communities Agency, 2015)
- CDH17 Inclusive Transport Strategy: Achieving Equal Access for Disabled People (Department for Transport, 2018)
Statements
- CDI1 London Borough of Richmond Statement of Case
- CDI2 WSP Statement of Case
- CDI3 Twickenham Studios Statement of Case
- CDI4 Statement of Common Ground
- CDI5 Statement of Disagreement
- CDI6 Proof - Fiona Dyson
- CDI7 Proof - Alan Potter
- CDI8 Proof - Scott Davidson
- CDI9 Proof - Barry Sellers
- CDI10 Proof - Will Marshall
- CDI11 Proof - Paul Bradbury
- CDI12 Proof - Philip Villars
- CDI13 Proof - Matthew Mehegan
- CDI14 Proof - Andrew Weeks
- CDI15 Proof - Mark Turner
- CDI16 Proof - Michael Wood
- CDI17 Chris Howe - proof of evidence and appendices
- CDI18 Mark Batchelor - Proof of evidence and summary proof of evidence
- CDI18 - Mark Batchelor
- CDI19 Proof - Jeremy Rainbird
- CDI20 Sunny Vohra - proof of evidence and summary proof of evidence
- CDI21 Proof Rebuttal - Fiona Dyson
- CDI22 Proof Rebuttal - Alan Potter
- CDI23 Proof Rebuttal - Joanne Capper
- CDI24 Proof Rebuttal - Mark Batchelor
Documents produced in the Inquiry
- CDJ1 Arlington Works floor space comparison
- CDJ2 BPP note on impact of loss of appeal site capacity
- CDJ3 PowerPoint presentation - design and character
- CDJ4 Proposed access parallel parking arrangements
- CDJ5 Sunny Vohra presentation
- CDJ6 Arlington Works updated floor space comparison
- CDJ7 BPP response to expressions of interest
- CDJ8 Email dated 7/3/2018
- CDJ9 Email dated 13/4/2018
- CDJ10 Email dated 18/4/2018
- CDJ11 Richmond Council costs application
- CDJ12 Arlington Views
- CDJ13 Map of large footprint buildings
- CDJ14 Richmond Council closing submissions
- CDJ15 London Plan Policies
- CDJ16 Appellant closing submissions
- CDJ17 LPA costs rebuttal
- CDJ18 Twickenham Studios costs rebuttal
- CDJ19 Complaints note
- CDJ20 Application notification letter
- CDJ21 Controlled parking zones
- CDJ22 Noise note (2)
- CDJ23 Title plan view SGL280384
- CDJ24 Twickenham Studios closing submissions
- CDJ25 Unexploited Capacity Assessment
- CDJ26 4786_3_25_B
- CDJ27 4786_3_15_B
- CDJ28 4786_3_10_C
- CDJ29 Mansell decision
- CDJ30 Twickenham Studios costs application
Documents produced after the close of the inquiry
Up to: Planning
Updated: 07 October 2022
Stay up to date! Make sure you subscribe to our email updates.