The scheme is designed to make the most of our position on the bank of the Thames, connecting the river to the town and making sure Twickenham is a thriving town centre for many years to come.

Latest project update

March 2026

Our construction partner Kier has secured the development area and works to clear the site are complete.

This included:

  • Demolition of all the existing buildings that were in the development area
  • Excavating the old lido
  • Undertaking archaeological investigations and utility diversions required

A temporary sub-station has also been installed to support the construction of the development as well as a temporary flood defence wall installed on the embankment.

In March 2026 we are moving from the demolition phase into the groundworks stage of construction. Piling for the foundations is expected to begin by the end of March 2026.

As the groundworks phase commences there is likely to be an increase in construction traffic in the area. Kier are co-ordinating deliveries carefully to minimise disruption to the roads and neighbours wherever possible.

The completion date of the development is scheduled for winter 2027.

Project details

Details about new homes, benefits of the project, our partners and contact details.

New homes

  • 45 residential units across the two buildings
  • 50% of which will be affordable homes (81% rented, and 19% shared ownership)

Additional benefits

  • New open space containing native trees and areas of planting, a children’s play area with a tree house and climbing wall, pétanque pitches, terraced lawns, tiered seating, and a new event space on the river
  • A widened Water Lane pedestrian footway, better connecting the town to the river 
  • Two new buildings (Water Lane and Wharf Lane) bookending the re-provided Diamond Jubilee Gardens as public open space at the centre of the scheme
  • Retail, office, and food and beverage units at the ground floor level of the new buildings
  • Removal of parking along the Embankment between Water and Wharf Lanes (except an area for servicing Eel Pie Island) in order to prioritise pedestrians and cyclists along the river
  • A river activity zone, with boat storage and a pontoon

Our partners

Construction partner: Kier
Housing partner: RHP

Key contacts

Claire Briggs, Senior Project Manager
claire.briggs@richmondandwandsworth.gov.uk

Consultation and engagement

Live consultations

We are making a number of changes to the Central Twickenham Controlled Parking Zone (Zone D). Representations on these changes are invited until Friday 30 January 2026. Find out more about the Zone D changes.

Upcoming events

There are currently no planned events.

Background information

The scheme began in 2019 when we brought in RIBA Competitions to run a design competition to find an architect-led team to bring forward a design for the Twickenham Riverside site. The team led by Hopkins Architects, and their concept design, were chosen as winners of the competition.

Planning  

The planning application submitted in summer 2021 was approved at Planning Committee on 24 November 2022. View the documents submitted as part of the planning application.

Previous consultation and engagement

There have been several periods of consultation and engagement over the years on the future of the Twickenham Riverside site. View information about previous consultations and engagements

Compulsory Purchase Order 

In order to deliver a comprehensive and cohesive regeneration of Twickenham Riverside, we had to make a compulsory purchase order.

A CPO inquiry was held in June 2023. 

On Thursday 9 November 2023 the CPO was confirmed by the Inspector appointed by the Secretary of State, and on the same date the Secretary of State issued the Section 19 Certificate. On Tuesday 14 November 2023 the Compulsory Purchase Order was confirmed by the Inspector appointed by the Secretary of State and on the same date the Secretary of State issued the Section 19 Certificate. 

On Thursday 14 December 2023 the Council first published notice of the confirmation of the Compulsory Purchase Order and grant of the Section 19.

View the Order Schedule and map:

General Vesting Declaration 1 was made on 21 May 2024 with the land vested on 5 September 2024.

View the sealed and dated General Vesting Declaration 1

General Vesting Declaration 2 was made on 4 November 2024 with the land due to vest shortly (date to be confirmed). View the sealed and dated General Vesting Declaration 2.  

View the Twickenham Riverside archive for previous information.

Stay up to date

Join our mailing list to get the latest updates about the development in your inbox. 

Updated: 18 March 2026

Stay up to date! Make sure you subscribe to our email updates.